Inquiry
FAQ
Busway & Busbar Trunking

For high-capacity power distribution, busway and busbar trunking systems offer superior space efficiency, heat dissipation, and flexibility compared to traditional heavy cabling. We specialize in the precise installation of these advanced systems for heavy industrial facilities, data centers, and large-scale commercial buildings. Our highly experienced technicians ensure perfect alignment, secure jointing, and rigorous testing for safe, efficient, and reliable power transmission.

We install busway from all the major manufacturers and follow each system's own jointing and torque procedure rather than a generic method, which is what keeps the manufacturer's warranty intact. Joint torque values and insulation resistance readings are recorded section by section, so you hold a complete set of records before the busbar is energised.

  • Busbars take up significantly less space, offer better thermal performance, provide easier tap-off points for future expansion, and are highly efficient for moving large electrical currents.

  • They are the ideal solution for data centers requiring dense, modular power distribution, large manufacturing plants, and high-rise commercial structures.

  • Yes. Precise joint assembly, torqueing to exact specifications, and rigorous insulation resistance testing are mandatory parts of our installation process to prevent any future failures.

Certificates
MK Electrical Invest certificate
MK Electrical Invest certificate
MK Electrical Invest certificate

Our certificates

Every installation we hand over is backed by a documented, independently audited management system. MK Electrical Invest holds ISO 9001 for quality management, ISO 14001 for environmental management and ISO 45001 for occupational health and safety — the three standards our clients in data centres, industry and energy ask for before a contract is signed.

Our electricians and supervisors carry individual competency certification for medium, low and extra-low voltage work, issued under the national qualification schemes of the countries we operate in. Certificates are re-verified before every mobilisation, so the team that arrives on your site is the team whose paperwork you have already approved.

Alongside the management-system standards we maintain manufacturer approvals for the busbar, cable containment and termination systems we install. These approvals mean our work keeps the original equipment warranty intact, and that the test results we issue are accepted by the manufacturer without a second inspection.

All certificates are available in full on request, together with current audit reports, insurance cover notes and method statements needed for your project's pre-qualification file.

Contact Us
Engineer

Interested? Contact us

Contact us to discuss your needs and how we can serve you.

+370 631 73 106